Calsens and Building Resilient will carry out a study on the fatigue behaviour of a span of the Ferrandet bridge over the Denia-Alicante railway line.
The span has just arrived at the ICITECH structures laboratory, and it has been no easy task to transport and position the 21m long span, but we managed it in the end.
The next step is to assemble the test frames to carry out the appropriate load cycles.







